20 tons gas hot water boiler
20 tons gas hot water boiler WNS14-1.25/130/70-Q Project. The waste gas of the project is mainly SO2, soot and NOx produced in the process of natural gas combustion. A natural gas hot water boiler in the project adopts a low nitrogen burner, and the combu
Online free consultation Leave messageA new 20T /h gas hot water boiler is installed in this project. According to the process, transportation, fire, safety requirements of the product, combined with terrain factors, in accordance with the relevant national standards and regulations, the production, transportation, greening has been optimized, and equipped with relatively perfect power supply, water supply, drainage and other infrastructure.
Main production equipment
The main equipment of the project is shown in the following table: Table 1 Main production equipment:
No1 | Equipment name | model | unit | Number of eia | Acceptance number | note |
1 | Natural gas hot water boiler | WNS14-1.25/130/70-Q | platform | 1 | 1 | new |
Annual raw material consumption of main raw and auxiliary materials and energy consumption items is shown in Table 2
No1 | Name of raw material | unit | consumption | note |
1 | natural gas | t/a | 1.3 million | new |
The waste gas of the project is mainly SO2, soot and NOx produced in the process of natural gas combustion. A natural gas hot water boiler in the project adopts a low nitrogen burner, and the combustion exhaust gas is discharged through a 15m high exhaust cylinder (H: 15m, D: 0.4m) after reaching the standard. The annual operation is 120d and 24h a day. It meets the standards of Key control areas (SO2:50mg/m3, NOX: 100mg/m3 and soot: 10mg/m3) in Boiler Air Pollutant Emission Standard (DB37/2374-2018), and the pollutants can meet the emission standards. The project has little impact on the surrounding environment